Menu

Aramco, Oil and Gas, Saudi Arabia

Front End Engineering and Eesign (FEED) work of the compression stations for the Master Gas System Expansion (MGSE) project which is designed to increase Aramco’s capacity to transport gas across the kingdom.  The aim is to increase the capacity of MGSE to 9.6 billion cubic feet of gas from 8.4 billion using the booster gas compressor and pumping stations.

Phase 1 has included:

  • 500 additional kilometres of pipelines
  • Two gas compression stations
  • Offsite and utilities

Services provided:

  • Programme and project management
  • Civil and structural engineering
  • Procurement and legal consultancy
  • Quality and commissioning
  • Talent management
  • Full immigration services
  • Security and risk management
  • Location and security inductions

Contact Us

If you have additional queries or would like further information, please get in touch with us.